Analyze Resource Capacityanalyze_resource_capacity
Analyze resource capacity utilization and overtime risk. Returns per-resource utilization %, overtime risk flags, and projected OT cost. Supports single resource or portfolio-wide analysis.
Answer
When to use Analyze Resource Capacity
Use for year-specific resource utilization and policy-classified overtime risk.
Governed tool contract
- Job
- Choose a better mix
- Output type
- Deterministic
- Write contract
- Read-only; no approval or commit action
- Governance
- Policy-backed (Capacity) with confidence and provenance
- Scope
- Chapter Isolated
- Role
- Member
Inputs
| Name | Type | Required | Accepted values / notes |
|---|---|---|---|
resourceId | String | No | Catalog-defined value |
year | Number | Yes | Catalog-defined value |
verbosity | String | No | summary · standard · detailed |
Question patterns
“Who is over capacity?”
“Where is overtime risk concentrated?”
Do not
Do not treat scenario, planned, committed, and actual values as interchangeable or bypass governed provenance.
Related references
Glossary terms
- capacity utilization
- overtime risk
Related capabilities
- Capacity Report
bty://reports/capacity/{year} - Resource Assignments
bty://resources/{resourceId}/assignments
Machine references
Compare this human reference with the generated public catalog and the live, authenticated capability contract.
